Sep 2012

Getting Organized

I’m not a very organized person. That may sound odd, given that this “blog” has a fairly extensive set of associated pages that are moderately well organized. But while I’m at least competent at organizing information, that skill doesn’t extend to the real world much at all.

When I started building the layout, I only had a few trains. Over the next two years I bought quite a few more, and partway through that the one shelf I had set aside for storing them became full and I expanded to half of a second. That filled, and there were no more available. Green Kato boxes began getting stacked in odd corners, on the layout itself, on the workbench, on shelves in the living room, and even in a small stack under the coffee table. For a while I managed to at least keep track of what I had and where it was, but late last year even that began to break down. As I mentioned last week, I somehow forgot to photograph one of my new trains (which was one of the few things I’d always done reliably, so I could keep track of them). And this summer it took me a week to find one of my older trains (the box was in a really odd place).
Read More...

New Train

I have a new train for the layout, the first since last December. This is an outer-commuter version of the E233, the Tōkaidō Line E233-3000. It’s actually two trains, as I bought both the 10-car (Kato 10-1114 & 10-1115) and 5-car (10-1116) sets, and the two both include motors. I haven’t had mine apart yet, but it supports DCC and the new “version 2” interior LED lighting according to the documentation. Or does it?
Read More...

August 2012 Status

It’s now three years since the start of work on Sumida Crossing (if you date from actually applying saw to lumber, and not the earlier design work). The rate of change has slowed over time, and virtually come to a standstill this summer, although that was largely due to external factors. At lot of the apparent slowdown is that the easy stuff is done. Assembling the whole supporting structure of the layout and building and painting all the tables took a couple of weeks of “layout time” (time I can spend working on the layout, which is somewhat limited). I can spend more than that painting and detailing one little plastic building. It’s also because right now I’m in a phase that mostly involves electronics work, and that’s really not the stuff that excites me. But I’ll slog on through it to get back to having running trains and be able to put my efforts into detailing the layout, and playing with trains.
Read More...