Jan 2010

January 2010 Status - Planning the Upper Level

This month was spent thinking about the track that will go on the upper (ground) level, above the subway. I never actually did finish wiring up the subway loop (although I can run trains on it using DC, they get a bit slow on the opposite side of the loop from the powerpack; rail is a poor conductor of electricity). Read More...

Site Administrivia - January 2010

Administrative comments on iWeb and changes to the site.
Read More...

Looking at Catenary

Catenary, the wire hanging above the track, is a significant scenic element of an electric railroad line. There are many types of catenary wiring, and probably even more types of poles or other structures from which it hangs.
Read More...

What Color Is My Light?

Lighting the layout isn’t something I’d expected to spend a lot of time on. I had existing lights that worked on my old layout, and I planned to continue using them. Initial experiences, and some problems with color accuracy in photographs, led me to do more investigation, and to ultimately change my plans. Read More...