Expressway

July 2011 Status - Expressway and Website

The month of July largely went to work on the expressway as part of the JNSForum’s 2011 contest, described on my page for the contest. The results so far can be seen in the photo above: one 6-inch segment of what will ultimately be a four-foot section of elevated expressway. Still missing is the guardrail down the median.
Read More...

Expressway Deck I

I’ve begun work on building the deck of the elevated expressway. As mentioned last time, the expressway is a four foot long structure with a roadway assembly (road, guardrails, signs and streetlights) made of styrene, which rests atop a narrow winding strip of plywood held up by 1/4-inch threaded rod sheathed in one inch PVC tubing. So far, all I have is the plywood, and the beginnings of the roadway assembly, which I’m calling the “deck” for short.
Read More...

Wiring Without Solder

Well, I’m not moving the site just yet. Conversion of pages is going more slowly than expected, and there are more pages that I consider necessary than I first thought there would be. So I’ll probably have a few more posts over the next couple of weeks before switching over to the new software and hosting provider. However, for the curious I’ve included some jpegs of the new main page and one of the subordinate pages showing the new layout and navigation links in the Diagrams album (these are reduced somewhat by iWeb; the type used for text on the page is about the same or slightly larger than the type used today).
Read More...

July 2010 Status - Behind the Scenes

Much of July went to more electrical work, partly planning, but mostly just crimping spade lugs to wires. Around 200 of them this month. There are now a total of six bus wire pairs beneath the tables: two for DCC (command station and future booster), two for the two tracks of the outer (Rapid/Shinkansen) loop, which will be switchable from DC to DCC, and one each for DCC accessory power and the Occupancy Detector & Signaling systems. I also wired up the control panel for the power.

Read More...

Subway Track Cleanup, Etc.

This weekend went largely to the beginning of the final (I hope) laying of the subway track, which has been in place, in whole or in part, through more than six months of construction. As a result, it has gotten a bit dirty. All track was pulled up, cleaned with isopropyl alcohol on a cotton pad, and relaid. At the same time, insulated unijoiners (black, in the photo above) were inserted to divide the track into electrical blocks (for power feeds and future occupancy detectors) and power feeds were wired up to terminal strips under the table. I didn’t get it all done, perhaps a bit more than half, but I should be able to finish it during the week and run trains by next weekend.
Read More...

Riverbank Scenery and April 2010 Status

April was a fairly busy month. The Urban Station scene received a tram line, and had the viaduct station structure finished. I also built the second level of the unsceniced return curves at the far end of the layout. And then I began working on the other bank of the large river (I’d done the far bank back in February).

I hadn’t done much on the riverbank by the end of the month, although it’s progressed a bit since then. The temporary expressway has been “completed” with the addition of some construction paper guardrails and support beams, as well as being lowered 1.5 cm. I’ve also rough-cut the foam that will go under it, although it needs to be trimmed back a bit, and then shaped to provide a levee up to the level of the bridge crossing the river, with a sloping hillside above it. Read More...

Temporary Bridge and Expressway

In trying to plan out the shape of the hillside that separates the large river from the two lengthwise scenes, I started laying out the road that will cross over the hill using white posterboard marked with lanes using black pen. This worked pretty well, and led to the idea of constructing a temporary bridge over the river using gray-faced foam core marked with fine-tipped paint markers I found in a local arts & crafts store. Read More...

It’s Alive! - November 2009 Status

Work has been progressing more slowly than I’d like, and the first level of foam has yet to be glued down, or the subway track installed. The backdrops were taken down and repainted in a lighter shade of blue, and I’m much happier with them now. Read More...